|
|
7-3-generator.html
7.3. GeneratorRemoval
PERFORMANCE ORDER |
1. Disconnect the battery from weight. |
2. Take off a belt from a generator pulley. |
3. Disconnect wires. |
4. Turn off the top and lower bolts and remove the generator. |
|
Installation
PERFORMANCE ORDER |
1. Installation is carried out upside-down. |
2. Adjust a tension of a belt and check an inhaling of fastenings. |
|
Check and replacement of brushes and regulator of tension
It is carried out at car repair shop.
|
|
|