Service of Nissan Sunny from 1991 to 1997 release in n-14 body.
1. Maintenance instruction
2. Maintenance
3. Engines
4. Cooling system
5. System of heating and ventilation
6. Fuel and exhaust system
7. System of launch of the engine
8. Coupling
9. Transmissions
10. Half shafts
10.1. Specifications
10.2. Removal of a half shaft
10.3. Installation of a half shaft
10.4. Repair of a half shaft and replacement of protective covers
10.5. Check of CV JOINTS
10.6. Bearing of an intermediate support of the right half shaft
11. Brakes
12. Suspension brackets and steering
13. Body
14. Electric equipment
 









10-6-podshipnik-promezhutochnojj-opory-pravojj-poluosi.html

10.6. Bearing of an intermediate support of the right half shaft

Replacement

PERFORMANCE ORDER
1. Remove the right half shaft.
2. Remove the internal CV JOINT, the bearing and the case of the bearing.
3. Clamp a half shaft in a vice and press a mud-reflector blows of the hammer to a mandrel.
4. Hook and get a bearing cover from outside which is turned inside.
5. Get a lock ring of the bearing.
6. Press the bearing assembled with the case from a half shaft. If the bearing changes, then it can be beaten out carefully blows of the hammer to a mandrel.
7. Get a lock ring of the bearing from the outer side.
8. Get a bearing cover.
9. Vypressuyte the bearing from the case blows to a mandrel which rests against an external holder.
10. Before assembly put lubricant in the bearing.
11. Press the bearing in the case so that it was possible to establish a cover and a lock ring.
12. Establish an emphasis under an internal holder and press in the bearing a half shaft blows to an end face through a wooden pro-rate so that it was possible to establish an internal lock ring.
13. Carefully to a napressuyta mud-reflectors.
14. Install the CV JOINT.
15. Establish a half shaft.


10.5. Check of CV JOINTS

11. Brakes