Service of Nissan Sunny from 1991 to 1997 release in n-14 body.
1. Maintenance instruction
2. Maintenance
3. Engines
4. Cooling system
5. System of heating and ventilation
5.1. Details of system of heating and ventilation
5.1.1. Control unit
5.1.2. Regulator cable
5.1.3. Heater
5.1.4. Heater radiator
5.1.5. Fan electric motor
5.1.6. Fan electric motor resistor
5.1.7. Electric motors of air gates
5.2. Conditioner
5.3. Conditioner units
6. Fuel and exhaust system
7. System of launch of the engine
8. Coupling
9. Transmissions
10. Half shafts
11. Brakes
12. Suspension brackets and steering
13. Body
14. Electric equipment
 









5-1-4-radiator-otopitelya.html

5.1.4. Heater radiator

Removal

PERFORMANCE ORDER
1. Remove a heater.
2. Get a fastening bracket.
3. Disconnect a gate drive rod, having removed a lock washer.
4. Remove a rod spring from the crane of a heater and remove a rod.
5. Get a radiator.

Installation

Installation is carried out upside-down.



5.1.3. Heater

5.1.5. Fan electric motor