5-1-detali-sistemy-otopleniya-i-ventilyacii.html
5.1. Details of system of heating and ventilationRemoval
PERFORMANCE ORDER |
1. Disconnect the battery from weight. |
2. Remove a forward decorative overlay of the dashboard (see subsection 13.26). |
3. Give the control unit on yourself and disconnect conducting sockets. |
4. Disconnect a temperature regulator cable from a rychazhka and get the control unit. |
|
Installation
PERFORMANCE ORDER |
Installation is carried out upside-down, at assembly transfer to the provision of the maximum thermolysis of a rychazhka of a temperature regulator and the mixing gate, attach a temperature regulator cable. |
|
|
|