Service of Nissan Sunny from 1991 to 1997 release in n-14 body.
1. Maintenance instruction
2. Maintenance
3. Engines
4. Cooling system
5. System of heating and ventilation
5.1. Details of system of heating and ventilation
5.1.1. Control unit
5.1.2. Regulator cable
5.1.3. Heater
5.1.4. Heater radiator
5.1.5. Fan electric motor
5.1.6. Fan electric motor resistor
5.1.7. Electric motors of air gates
5.2. Conditioner
5.3. Conditioner units
6. Fuel and exhaust system
7. System of launch of the engine
8. Coupling
9. Transmissions
10. Half shafts
11. Brakes
12. Suspension brackets and steering
13. Body
14. Electric equipment
 









5-1-5-ehlektrodvigatel-ventilyatora.html

5.1.5. Fan electric motor

Removal

PERFORMANCE ORDER
1. Disconnect the battery from weight.
2. Remove a glove box, having unscrewed two screws.
3. Remove the lower panel from the passenger, having unscrewed three screws.
4. Remove an arm of a glove box.
5. Disconnect hoses of air ducts in the electric motor case basis.
6. Unscrew screws and get the electric motor.
7. Apply tags on the disconnected arms.

Installation

PERFORMANCE ORDER
Installation is carried out upside-down. Establish arms on the put tags and attach hoses of air ducts.


5.1.4. Heater radiator

5.1.6. Fan electric motor resistor