Service of Nissan Sunny from 1991 to 1997 release in n-14 body.
1. Maintenance instruction
2. Maintenance
3. Engines
4. Cooling system
5. System of heating and ventilation
6. Fuel and exhaust system
7. System of launch of the engine
8. Coupling
9. Transmissions
9.1. Mechanical transmission
9.1.1. Specifications
9.1.2. Mechanism of change of transfers
9.1.3. Epiploons
9.1.4. Sensor of neutral situation
9.1.5. Backing signal switch
9.1.6. Speedometer reducer
9.2. Automatic transmission
10. Half shafts
11. Brakes
12. Suspension brackets and steering
13. Body
14. Electric equipment
 









9-1-2-mekhanizm-smeny-peredach.html

9.1.2. Mechanism of change of transfers

Removal

PERFORMANCE ORDER
1. Remove the central section of the forward panel.
2. Lift a forward part of the car and establish on supports.
3. Unhook a spring of a rod of inclusion of transfers.
4. Turn off nuts and get bolts of axes of a rod from the check point and the lever.
5. Disconnect a rod from an arm at the check point, turn off nuts and disconnect a rod arm from the bottom and get a rod with an arm.
6. Remove a bracket, get a check point control lever, remove a small cover in the lever basis.
7. If necessary turn off nuts, remove a cover frame, get a bracket and remove a cover.
8. Check a condition of details, especially plugs of an axis and the hinge of a rod, replace worn-out covers.

Installation

PERFORMANCE ORDER
1. Installation is carried out upside-down.
2. Grease with jellied lubricant of the plug and a rod axis.
3. Tighten nuts and bolts with the set moment.


9.1.1. Specifications

9.1.3. Epiploons