Service of Nissan Sunny from 1991 to 1997 release in n-14 body.
1. Maintenance instruction
2. Maintenance
3. Engines
3.1. 1,4 and 1,6 liters petrol engine
3.1.1. Types of repair of the engine without dismantle from the car
3.1.2. Dismantle and capital repairs of the engine
3.1.2.1. Specifications
3.1.2.2. Capital repairs of the engine
3.1.2.3. Diagnostics of the engine by means of the vacuum gage
3.1.2.4. The power unit from the manual transmission
3.1.2.5. The power unit with automatic transmission
3.1.2.6. Head of the block of cylinders
3.1.2.7. Head of cylinders and valves
3.1.2.8. Pistons and rods
3.1.2.9. Crankshaft
3.1.2.10. Block of cylinders
3.1.2.11. Conrod and piston group
3.1.2.12. Radical and conrod bearings
3.1.2.13. Piston rings
3.1.2.14. Launch of the engine after capital repairs
3.2. 2,0 liters petrol engine
3.3. Diesel engine
4. Cooling system
5. System of heating and ventilation
6. Fuel and exhaust system
7. System of launch of the engine
8. Coupling
9. Transmissions
10. Half shafts
11. Brakes
12. Suspension brackets and steering
13. Body
14. Electric equipment
 









3-1-2-14-pusk-dvigatelya-posle-kapitalnogo-remonta.html

3.1.2.14. Launch of the engine after capital repairs

PERFORMANCE ORDER
1. After the end of assembly of the engine check the level of oil and cooling liquid twice.
2. Check correctness of connection of conducting and hoses, remove from a motor compartment everything foreign objects.
3. Disconnect wires of spark plugs and turn out candles. Get a high-voltage wire from a cover of the distributor and reliably connect to weight.
4. Turn the crankshaft a starter before blackout of a control lamp of emergency pressure of oil.
5. Screw candles and put to the place of a wire of candles and a distributor wire.
6. Start the engine. The engine has to be started later the short period necessary for filling with gasoline of the fuel highway.
7. In process of a warming up of the engine you watch closely emergence of leaks of oil, gasoline or cooling liquid. Emergence of unusual smells and smoke from the details which are affected by high temperature because of burning out of the remains of oil is allowed.
8. If everything is all right, then wait the top hose of a radiator then stop the engine will not heat up yet and check levels of oil and cooling liquid.
9. Check installation of ignition and turns of idling, stop the engine.
10. Several minutes later check the level of oil and cooling liquid, if necessary restore.
11. If bolts of a head of cylinders are tightened according to the present description, then at the first launch of the engine after capital repairs it is not necessary to tighten head bolts.
12. If new pistons, rings, radical and conrod bearings were installed, then the engine has to pass a running in throughout the first 800 km of a run.
13. In the period of a running in driving with completely open butterfly valve or with too small speed on any transfer is not allowed.
14. It is recommended to replace oil and the filter after a running in.


3.1.2.13. Piston rings

3.2. 2,0 liters petrol engine