Service of Nissan Sunny from 1991 to 1997 release in n-14 body.
1. Maintenance instruction
2. Maintenance
3. Engines
4. Cooling system
5. System of heating and ventilation
6. Fuel and exhaust system
6.1. Carburetor engines
6.2. Engines with system of injection of fuel
6.2.1. Specifications
6.2.2. Air filter
6.2.3. Cable of the drive of a butterfly valve
6.2.4. Pedal of management of a butterfly valve
6.2.5. Fuel
6.2.6. System of injection of fuel
6.2.7. Decompression of fuel system
6.2.8. Fuel pump
6.2.9. Fuel level sensor
6.2.10. Fuel tank
6.2.11. System of injection of fuel
6.2.12. Case of a butterfly valve
6.2.13. Units of system of injection of fuel
6.2.14. The soaking-up collector
6.2.15. Final collector
6.2.16. Exhaust system
6.3. System of food / production of the fulfilled gases
6.4. System of decrease in toxicity of the fulfilled gases
7. System of launch of the engine
8. Coupling
9. Transmissions
10. Half shafts
11. Brakes
12. Suspension brackets and steering
13. Body
14. Electric equipment
 






Welx официальный сайт: https://welx.net



6-2-12-korpus-drosselnojj-zaslonki.html

6.2.12. Case of a butterfly valve

Removal

PERFORMANCE ORDER
1. Disconnect the battery from weight.
2. Remove the air filter.
3. Press on brackets and disconnect sockets from a potentiometer of a butterfly valve, the air perepuskny valve, the measuring instrument of a stream and the valve of the proofreader of idling.
4. Disconnect a drive cable from a butterfly valve, release nuts and remove a cable cover from an arm.
5. Disconnect kick cable - down - the mode (on the car with automatic transmission).
6. Designate all vacuum and air hoses and disconnect them from the gate case.
7. Disconnect hoses of cooling liquid from the gate case, quickly having muffled them.
8. Turn off bolts (are specified by shooters) and remove the case of the gate and laying.
9. Muffle an opening in a collector.

Installation

PERFORMANCE ORDER
1. Installation is carried out upside-down.
2. Clear demountable surfaces, replace laying and tighten bolts in 2 stages with the set moment.
3. Check correctness of connection of hoses and wires, in reliability of their fastening.


6.2.11. System of injection of fuel

6.2.13. Units of system of injection of fuel