Service of Nissan Sunny from 1991 to 1997 release in n-14 body.
1. Maintenance instruction
2. Maintenance
3. Engines
4. Cooling system
5. System of heating and ventilation
6. Fuel and exhaust system
7. System of launch of the engine
8. Coupling
9. Transmissions
10. Half shafts
11. Brakes
12. Suspension brackets and steering
12.1. Specifications
12.2. Bearings of naves of forward wheels
12.3. Rack of a forward suspension bracket
12.4. Lower lever
12.5. Spherical support of the lower lever
12.6. Stabilizer of cross stability of a forward suspension bracket
12.7. Bearings of back wheels
12.8. Details of a back suspension bracket
12.8.1. Rack of a back suspension bracket
12.8.2. Levers of a back suspension bracket
12.8.3. Bars
12.8.4. Nave case
12.8.5. Stabilizer of cross stability of a back suspension bracket
12.9. Wheel
12:10. Switch of ignition and lock of blocking of a steering column
12:11. Steering column
12:12. Steering mechanism
12:13. Covers of steering transfer
12:14. Hydraulic actuator
12:15. Pump of the hydraulic booster
12:16. Tips of steering draft
13. Body
14. Electric equipment
 









12-8-2-rychagi-zadnejj-podveski.html

12.8.2. Levers of a back suspension bracket

Removal

PERFORMANCE ORDER
1. Lift a back part of the car and establish on supports.
2. Remove a wheel.
3. Turn off axis nuts (are specified by an arrow) levers on the nave case.
4. If levers change, then designate their situation, having applied tags on clowns of bolts of fastening of levers to arms of a body and on arms (clowns regulate a convergence of wheels).
5. Turn off nuts of bolts of fastening of levers to a body, get the clown and a bolt.
6. Remove levers (shooters specified nuts of bolts of fastening of levers to body arms). At removal remember an arrangement of bolts.

Check

PERFORMANCE ORDER
1. Check a condition of levers and plugs.
2. Levers change only assembled with plugs.

Installation

PERFORMANCE ORDER
1. Install levers in arms and pass bolts, having established them in a former order.
2. Put on washers and wrap new nuts.
3. Insert an axis of levers from the back party of the case of a nave, dress washers and wrap new nuts.
4. Establish a wheel and lower the car.
5. Roll the car forward and back, shake up – down.
6. Tighten a nut of an external axis of levers.
7. Expose clowns on tags, check a convergence of back wheels and tighten nuts with the set moment (And – a negative convergence, In – a positive convergence, 1 – the right side, 2 – the left side).
8. If the convergence cannot be checked, then tighten nuts then address on car repair shop.


12.8.1. Rack of a back suspension bracket

12.8.3. Bars